Agreement with the relevant Local Authorities is currently being finalised for additional junctions and signage is being rolled out and will be completed for the critical sections by the end of the year. Electronic signs on the M50 will be used to inform drivers when diversions are in place and each diversion route will be indicated by a specific symbol which drivers will be directed to follow. M50 Major Emergency Diversion.
Heavy rain causing flooding. I am so angry that absolutely no notice was given for the closure of the M50 westbound this evening , 1st of August. Whoever was responsible for this needs to reconsider their competence. This has resulted in me missing a meeting and costing me time and money both in fuel and business. Your email address will not be published. Save my name, email, and website in this browser for the next time I comment.
This site uses Akismet to reduce spam. Learn how your comment data is processed. Reason : Road repairs are planned. Status : Pending. Schedule : From on 19 November to on 20 November Please take the footbridge to the other side of the road and turn left. The entrance to the Hermitage is approx m down this road. Take the exit for the N4 and when on the N4 move to left hand lane and follow signs for Liffey Valley Shopping Centre this will be the first exit off the N4. Highlight The upgrade removed a significant immediate traffic hazard arising from underutilisation of capacity at the roundabout.
Services provided: Civil engineering design Traffic engineering.
0コメント